Contract name: Waste Water Collection System for West Zarqa Zone
Contract No.: 84/2011
Brief Description: House connections Ø 150m concrete pipes. Waste water networks collection system consisting of concrete pipe Ø 200-500mm , UPVC pipes Ø 160,200 mm, Ductile iron pipes Ø 200mm, In addition to precast and cast in situe concrete manholes.
Amount of contract: 13,364,500.000 USD
Name of Employer: MCA – Jordan
Project period: 1095 days
Awarded date: 1/12/2012